NL EN +31 6 3844 1395 Contact
For developers

Less development risk. More predictability.

Prefab timber construction for developers who want to keep their planning, budget and execution under control — from multi-family housing to entire residential districts.

Plan a project reviewSend your drawings for a first assessment

Your project in one chain

One party, responsible for the whole structural shell

The biggest development risk sits in the seams between parties: the handover from engineering to production, from production to assembly, from factory to site. At ZTC those links are in one hand — which removes coordination risk, failure costs and finger-pointing from your project.

  1. 01

    In-house engineering

    Production drawings per housing type, BIM exchange via IFC, every junction coordinated before production. Once the technical design is frozen, the fixed price is set.

  2. 02

    In-house production

    CNC production at ±1 mm in our own factory, climate-controlled and inspected — not dependent on subcontractors or site conditions.

  3. 03

    In-house assembly

    Assembly by ZTC's own crews, 3–5 days per storey, phased per block for series so your build flow keeps running.

  4. 04

    Dutch guidance

    One fixed Dutch point of contact guards the chain from first sketch to handover — your direct line to engineering, production and management.

The logic

Why predictability creates return

You don't have to believe any numbers to see the mechanism — each link works straight through into your project calculation:

  • Shorter build time means fewer months of construction interest on your financing.
  • Less work on site means less dependence on the tight Dutch labour market.
  • Factory production means less weather impact and fewer failure costs.
  • A fixed contract price means less budget uncertainty in your calculation.
  • A short, predictable assembly means starting fit-out, sale or rental sooner.

Executive FAQ for professionals →

Honest about the numbers

Where prefab timber becomes financially interesting

Prefab timber is not by definition the cheapest method on the bare build sum — and we promise no percentages we cannot substantiate. But on projects where lead time, labour availability and predictability weigh heavily — inner-city, nitrogen-sensitive, or with tight financing — prefab timber can offer advantages over traditional construction. Whether that holds for your project, we calculate with you project-specifically.

Why Dutch clients work with ZTC

A controlled process, not an anonymous factory

You are not dealing with a faceless foreign supplier. ZTC produces in Latvia — which lowers cost and your dependence on the tight Dutch labour market — while you keep one fixed Dutch point of contact who steers your project from first sketch to handover.

Proven track record

400+ completed projects in 14 countries, since 1991.

Fixed price

The contract price is the final price — no escalation clauses.

In-house delivery

Engineering, production and assembly crews under one roof.

Dutch point of contact

Theo Rolvink steers your project from sketch to handover — the buffer between you and the factory.

Isn’t building with a foreign manufacturer actually riskier?

It seems logical. But clients who look closely judge a supplier on five things: experience, a fixed price, available production capacity, reference projects, and local support. ZTC delivers on each — and your risk stands or falls on exactly those points, not on the country of production.

Unsure about building with a foreign manufacturer?

Visit our factory in Latvia: talk to our engineers, walk past live production projects and see how your project is produced. That removes more doubt than any brochure.

Visit our factory in Latvia

Let's see whether this project is interesting for prefab

No quote-chasing — a conversation between professionals. Send your drawings or plan and we'll assess the technical feasibility, planning and build method together.

Plan a project reviewSend your drawings for a first assessment →